PROJEK REMU
Automation

Master schedule

Getting the page ready…
1

The three workbooks

Getting the page ready…

2

Month and public holidays

A day number means that day of the chosen month; write a full date (2027-01-01) for a day in the month before or after.
Fixed-shift staff get PH on a public holiday; rotating staff work it.

public holidays in the schedule
add the three workbooks first

3

Daily minimums and maximums

Add the three workbooks in step 1 and choose the month in step 2: the seats each shift needs on each day are set here.
4

Names and the tracker

Add the three workbooks in step 1 and choose the month in step 2: Sheet1's names are matched with the tracker here.
5

Master Schedule.xlsx

build an earlier draw again

Every build is a new draw, so no two come out the same.
Its number is shown with the result and written in the report.
Typed here, it builds that schedule again, as long as the three workbooks, the month, the holidays, the minimums and the maximums are the same.

The schedule shows here once built, to check and download.